Papaya plantation - Ghana
2016
Project concept: Papaya plantation of 20 HA, irrigated using drip lines. The project is done in 2 phases. Phase A of 10 HA had already been executed.
AIP Ltd. designed the pumping station as well as the infield of the total 40 plots of trees. AIP Ltd also supplied the entire equipment for the project and supervised during the implementation.
